Project Description

Mekong Furniture

Mekong Furniture

PV System Profile | 

Location: Binh Duong, Vietnam
Operator: Shire Oak International
Commissioning: 31/12/2020
PV system power: 3,247.8  kWp
Annual Production: Approx. 4,932,000 kWh (1,517 kWh/kWp/year)
CO2 avoided: Approx. 4,503 tons per annum